Survey
The simpliest way is to implement survey by conventinal tools, such as measure tape, telemeter, etc. Upon the result data we draw the sketch and then process them for the facility department. The main phases are:
- on site inspection
- Drawing sketches
- Survey, data entrace
- ProcessSupervisory
Drawing process
The results of measuring should be recorded. The quality and the content are laid down by the entered data, however, by a proper data integration any drawing information can be accessed.
- Layout
- Section
- MEP drawing
- Electrical schema
- Operation and safety drawing
Inventory
There are many methods to run the inventory, depending the company conditions. Those ones applied bare-code or RFID system, the procedure implementacion is fast, other ones apply the convencional way; the assigned persons of the staff check each objects on the spot. The result shall be recorded alphanumerically, optionally by graphical way, and shall be categorized.
Quotation request
For quotaion request (either convencional measurement or drawing modell procession), please fill in the form.
By the clicking you accept the K-ep Studio GDPR rule.